Thursday, March 6, 2014

80 TOP Multiple Choice Questions and Answers for Manual Testing

The Below list of top 80 Manual Testing Multiple Choice Questions and Answers for freshers beginners and experienced pdf, Manual Testing Interview Questions and Answers
1. Methodologies adopted while performing Maintenance Testing
2. Which of the following is true about Formal Review or Inspection:-
3. The Phases of formal review process is mentioned below arrange them in the correct order.
4. Splitting project into tasks and estimate time and resources required to complete each task called as Project Scheduling
5. White Box Techniques are also called as :-
6. What is an equivalence partition (also known as an equivalence class.?
7. The Test Cases Derived from use cases
8. Exhaustive Testing is
9. Which of the following is not a part of the Test Implementation and Execution Phase
10. Which of the following techniques is NOT a White box technique?
11. A Project risk includes which of the following
12. In a risk-based approach the risks identified may be used to :
13. Which of the following is the task of a Tester?
14. The Planning phase of a formal review includes the following :-
15. A Person who documents all the issues, problems and open points that were identified during a formal review.
16. Who are the persons involved in a Formal Review :-
17. Which of the following is a Key Characteristics of Walk Through
18. What can static analysis NOT find?
19. Incidents would not be raised against:
20. A Type of functional Testing, which investigates the functions relating to detection of threats, such as virus from malicious outsiders.
21. Which of the following is not a major task of Exit criteria?
22. Testing where in we subject the target of the test , to varying workloads to measure and evaluate the performance behaviors and ability of the target and of the test to continue to function properly under these different workloads.
23. Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is :-
24. Static analysis is best described as:
25. One of the fields on a form contains a text box which accepts alpha numeric values. Identify the Valid Equivalence class
26. Reviewing the test Basis is a part of which phase
27. Reporting Discrepancies as incidents is a part of which phase :-
28. Which of the following items would not come under Configuration Management?
29. Handover of Test-ware is a part of which Phase
30. The Switch is switched off once the temperature falls below 18 and then it is turned on when the temperature is more than 21. Identify the Equivalence values which belong to the same class.
31. The approach/document used to make sure all the requirements are covered when writing test cases
32. Executing the same test case by giving the number of inputs on same build called as
33. Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.
34. To check whether we are developing the right product according to the customer requirements are not. It is a static process
35. To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.
36. Staff development plan describes how the skills and experience of the project team members will be developed.
37. It is a set of levels that defines a testing maturity hieraecy
38. A Non-Functional Software testing done to check if the user interface is easy to use and understand
39. The review and approved document (i.e. Test plan, System Requirement Specifications) is called as
40. What are the Testing Levels?
41. Cost of quality = Prevention Cost + Appraisal cost + Failure cost
42. A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?
43. It measures the quality of processes used to create a quality product.
44. Variance from product specifications is called?
45. Verification is _____.
46. White box testing is not called as______.
47. Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as
48. Retesting of a single program or component after a change has been made?
49. Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)
50. The testing which is done by going thro the code is known as,

More Manual Testing Interview Questions : Click Here
More Manual Testing Multiple Choice Questions: Click Here

51. Configuration Management Plan describes the Configuration Management procedures and structures to be used.

52.This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as
53. Phase Definition. It will come under
54. Software testing which is done without planning and Documentation is known as
55. Acceptance testing is known as
56. Retesting the entire application after a change has been made called as?
57. Boundary value analysis belongs to which testing method?
58. It measures the quality of a product
59. What are the Types of Integration Testing?
60. Product Risk affects The quality or performance of the software.
61. A metric used to measure the characteristic of documentation and code called as
62. Which is non-functional software testing?
63. The process that deals with the technical and management issues of software development called as?
64. Executing the same test case on a modified build called as
65. Which is Black-Box Testing method?
66. Business Risk affects The Organization developing or Procuring the software.
67. Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA..
68. Automation Testing should be done before starting Manual testing.
69. Earlier a defect is found the cheaper it is to fix it.
70. Informing to the developer which bug to be fix first is called as
71. Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.
72. Retesting modules connected to the program or component after a change has been made?
73. An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under
74. Alpha testing will be done at,
75. SPICE Means _____.
76. Requirements Specification, Planning, Test case Design, Execution,
Bug Reporting & Maintenance This Life Cycle comes Under
77. It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.
78. Standards and procedures for managing changes in an evolving software product is called?
79. Path Tested = Number of Path Tested / Total Number of Paths
80. This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as

No comments: